District heating, gas, steam and process piping systems for all media, temperatures and pressures and use in the oil and paper, chemicals, steel and processing industries.
A selection from our reference list
-
AGIP
- Modification of a deep tank at the Fürnitz tank farm
- Installation of a bottom loading platform and enlargement of the additive installation at the Zirl tank farm
- Modification of a deep tank at the Zirl tank farm
-
Biochemie, Kundl
- Modification of the ARA 2 blower house
- Supply and installation of a ventilation system, Building 135
- Supply and installation of a ventilation system, Building 131 ground floor + 2nd floor
- Supply and installation of a ventilation system, Building 143, switchgear cubicle and transformer ventilation
- Filtrate well on the banks of the Inn, HFB 4
Air intake and exhaust air system for switchgear cubicle and transformer ventilation
- Laboratory building 203, heating, air conditioning, ventilation and sanitation systems
-
BP AUSTRIA
- Modification of deep tanks at tank farms in Linz, Salzburg, Klagenfurt
- Fitting of a deep tank with a monitored vacuum double bottom
- Tank farm piping system construction
- Red Bull, Salzburg
Planning of an airfield refuelling system with two 70 m3 underground tanks for JET-A1 and AVGAS (aviation fuel)
-
CASTROL
- Pipe laying and conversion of various plants to mineral oil processing
- Equipping of a laboratory and a heptane plant
- Completion of mechanical maintenance
- Transfer of a barrel filling machine
- Various assignments throughout the plan
-
DÜRR, STUTTGART
- Complete installations for a paint shop for truck cabs at SNF Steyr, including ventilation, steel construction, machine assembly, container assembly, hydraulics and transport system installation
- Installation and piping for the complete paint supply of the truck cab paint shop at SNF Steyr
- Installation of an RTO plant at SUNPOR St.Pölten
- Modification and enlargement of the truck cab paint shop at SNF Steyr including ventilation, steel construction, piping, steel construction, transport system and process technology.
- Installation of automatic painting systems
- Installation of a CTO plant, Reichhold Chemie, Vienna
- Installation of a CTO plant, Morton/Dr. Renger, Strullendorf bei Bamberg/Germany
- Supply and installation of various steel structures
- Assembly and overhauls of automatic painting machines at:
OPEL Rüsselsheim
BMW Munich
OPEL Bochum
BMW Dingolfing
FORD Cologne
VW Hanover
AUDI Ingolstadt
MERCEDES Rastatt
- Installation of a thermal waste air treatment system, Flock, Messtetten/Germany
- Complete mechanical assembly of 2 Ecoprint Esta Primer systems, as well as a water-soluble paint system at Mercedes Benz Dusseldorf
- Complete mechanical assembly for application on four primer and paint coating lines at AUDI Ingolstadt
- Complete mechanical assembly of a primer and paint coating line at DAEWOO Warsaw
- Complete mechanical assembly of a paint coating cabin at DAEWOO Nysa (Poland)
-
FERNWÄRME FELDBACH
- Enlargement of the district heating network in the Feldbach urban area, DN 200/150
-
GRAZER STADTWERKE AG
- Enlargement of the district heating network in the entire urban area, DN 15/200
- Refurbishing of the district heating network in the shaft area, DN 400, DN 350
- Installation of a district heating line at Graz Provincial Hospital, DN 350
-
HERZOG
- Stainless steel piping systems at
AGM Graz
Karbinovsky & Bartl
- Supply and installation of district heating supply lines, DN 2000
-
WELS HOSPITAL
- Supply and installation of district heating supply lines, DN 2000
-
KREUZMAYR MINERALÖLE, EFERDING
- Conversion of a fuel store
Eight 100 m3 tanks
-
LEOPOLD PHARMA, GRAZ
- Various piping assignments throughout the plant
-
MOBIL OIL AUSTRIA
- Kagran plant:
Pipeline laying
Completion of mechanical maintenance in the plant
Supply and installation of steelwork and conversion of the wax emulsion unit
Refurbishing of a glass fibre reinforced plastic tank
- Linz tank farm:
Conversion of top loading fuel unit into a bottom loading system
- Klagenfurt tank farm:
Enlargement of the additive installation
Transfer of a deep tank from the Lienz tank farm to the Klagenfurt tank farm
-
NYCOMED AUSTRIA
- Complete supply and installation of the piping system in the new pharmaceutical technical centre, Building 37
- Exchange of the complete nitrogen supply system, Building 33
- Oxygen supply line system
- Exchange of the complete brine line network
- Piping of the PX installation
- Planning, supply and installation of the piping for new ampoule production, Building 33
- Dis- and reassembly of various machines, Building 33 (for the new ampoule production)
- Various steel construction and piping assignments throughout the plant
- Hydrogenation piping installation
- Sulphuric acid line installation
- Hydrochloric acid line installation
- Sodium bicarbonate liquor line installation
- Supply and installation of wastewater collectors including piping
- Piping for an exhaust air system
- Replacement of the entire well water network
- Installation and piping of an inox-smooth drier
- Production of various special components (collecting basins, etc.)
- Replacement of the entire drinking water network
-
OKA
- Enlargement of the Riedersbach-Ostermieting-Trimmelkam
- district heating network, including house connections
-
OLPIDÜRR, MAILAND
- Complete installation of a paint shop at Grundig Austria, Vienna, including the piping systems, ventilation, steel construction, machine and transport system assembly
-
FRANTSCHACH PAPER MILL
- Dis- and reassembly of a vibratory sorter and branch dewatering screw conveyor
-
NETTINGSDORF PAPER MILL
- Dis- and reassembly of Saralla and Jagenberg rewinders
- Disassembly of a heat recovery installation, PM 3
- Supply and installation of various pumps
- Equipment installation
- Supply and installation of various pipelines throughout the mill
-
SCA LAAKIRCHEN AG PAPER MILL
- Refiner installation
- Pump and equipment installation, PM 10
- Installation of various pipelines throughout the mill
- Cleaner modification
- Steel construction work
- Modification of the press break and wet break and machine pulper
-
STEYRERMÜHL PAPER MILL
- Supply and installation of tambour rolling stands
- Supply and supply of steel stopper sealings
- Various steel construction assignments
-
PATEX CHEMIE, TRAUN
- Erection work and piping for a cooling tower
- Supply and installation of steelwork for a cooling tower
- Resin tank modification and piping
- Dosing station
-
SCA HYGIENE AG, (PWA ORTMANN)
- Assembly and supply of the piping system for thin paper sorting, PM 9
Reject preparation, PM 6
18.
Thickener erection, PM9
Media piping installation
Steelwork
- Supply and installation of foundation frames for presses, double sieve forms and Pope reel winder.
- Supply and installation of a media pipeline, including steel work, for PM 4
- Supply and installation of linkage pipelines, PV 3
- Various assignments throughout the mill
- Diverse machine housings and safety fatures
- Modification of heat recovery system, PM 9
- Modifications to the separating drum
- Installation of fire smoke extractors
- Installation of the linkage pipelines, pipe and steel construction for the new kraft centre
- Laying of a new, welded plastic sewer
- Vario Split modification
- Transfer of serviette machines from Belgium and France to Austria
-
SCHENK AIR, SCHRUNS
- Idalpe – Ischgl, Tyrol
- Planning, supply and installation of double shell containers, ÖNORM C 2110, 100 m3
- Leakage surveillance for JET-A1 fuel pump including piping with max. 4 bar in the pressure line
-
SHELL AUSTRIA
- Lobau tank farm:
- Modification and enlargement of a top-bottom loading LS 3
- Installation of a bottom loading installation and additive enlargement
- Conversion of a top loading unit to bottom loading
- Various piping and steelwork assignments throughout the farm
- Piping work for the storage and supply of AVGAS (aviation fuel)
- Laying of pipelines for fuel pumping
- Graz tank farm:
Production of linkage pipelines
- Linz tank farm:
Conversion from top to bottom loading, LS 3
-
SULZER ESCHER WYSS, WELS (AXIMA KÄLTETECHNIK)
- Supply and installation of the piping system for a refrigeration unit
Nycomed Austria GmbH, Linz
- Supply and installation of a 42 m3 special steel, brine tank
Nycomed Austria GmbH, Linz
- Supply and installation of a cooling water piping system
Richter Pharma, Wels
- Supply and installation of the piping system for a refrigeration unit
Frisch & Frost, Hollabrunn
- Ammonia plant extension
Ried Brewery
- Installation of a cooling water supply system
Unitech, Kirchdorf
- Enlargement of a R 22 refrigeration unit
Handlbauer, Wels
- Refurbishing of a cooling water system
Kneissel Dachstein
- Piping system for an ammonia, quick freeze tunnel for pigs
Großfurtner
- Ammonia piping system
Steyr ice rink
-
VALMET
- Disassembly of a pulper at Neusiedler AG Hausmening and installation of a new pulper in the course of machine enlargemen
-
VAN DER LANDE, NETHERLANDS
- Complete installation and start-up of a card sorting plant at GRUNDIG AUSTRIA, Vienna
Planning, supply and installation of steelwork for a card sorting plant
Exchange of the pipe compensator in the coke gas line, DN 1800
Disassembly of the Lurgi e-filter, LD III
Enlargement of the electrolytic zinc coating plant
Installation of the belt coiler, Cold Rolling Plant I and II
Manufacture and supply of various special parts
Installation of a new pipe straightening installation, including the hydraulic lines at Schöller Bleckmann
Supply and installation for the hydraulic lines on the No. 1 rail straightening press
Supply and installation of PE-HD material cooling water pipes for edible oil refining
Supply and installation rehabilitation work on steam and condensate piping systems for wine production at LENZ MOSER, Rohrendorf
Media piping and machine alterations
Assembly of equipment components for the Pöls sewage plant
Supply and installation of various steel constructions
-
VOEST ALPINE, LINZ
- Exchange of the pipe compensator in the coke gas line, DN 1800
- Disassembly of the Lurgi e-filter, LD III
- Enlargement of the electrolytic zinc coating plant
- Installation of the belt coiler, Cold Rolling Plant I and II
- Manufacture and supply of various special parts
- Installation of a new pipe straightening installation, including the hydraulic lines, at Schöller Bleckmann
-
VOEST ALPINE, ZELTWEG
- Supply and installation for the hydraulic lines on the No. 1 rail straightening press
-
WERRA-PAPIER, WERNHAUSEN (GERMANY)
- Supply and installation for the material preparation piping system
- Machine assembly and piping installation of the constant parts, PM 3 and PM 4
-
PULP PLANT, PÖLS
- Supply and installation of various pipelines
- Installation and start-up of the Hooper sorter
- Supply and installation of a defoaming unit