Customer Trumpf Maschinen Austria GmbH & Co KG
Planning office TB Adenbeck
Subject fields Heating, air-conditioning, ventilation and sanitation systems; instrumentation and control engineering
Timeline October 2013 – September 2014
The project

The branch of Trumpf in Pasching added two production halls and two office extensions.

Heating/cooling of the production halls via concrete core temperature control

Cooling capacity production halls and southern office: approx. 770kW

With two Turbocore refrigeration machines

Ventilation production halls: approx. 100.000m³/h

Air supply via displacement ventilation diffusers

Ventilation southern office and fitness area: approx. 10.000m³/h

Instrumentation and control engineering was extended and adapted by Siemens

Heating capacity northern office: approx. 100kW

Supply via underfloor heating in the entrance area and via radiators in the offices

Cooling capacity northern office: approx. 200kW

Here Lindner is supplying the cooling ceilings.

Ventilation northern office: approx. 11,000 m³/h

Air supply via floor diffusers on the ground floor and via slot diffusers on the first floor.

The refrigeration machines’ heat exchangers had to be lifted onto the roof of the existing hall with a 450 tonne crane.