Customer INV Totalunternehmer GmbH - BAI
Planning office ZFG - Hr. Ing. Rechberger
Subject fields Heating, air-conditioning, ventilation and sanitation systems, insulation, fire safety; instrumentation and control engineering; cooling ceilings
Timeline December 2013 - January 2015
The project

An office block consisting of two connected units was built opposite the Viennese shopping and entertainment centre Gasometer and the underground station of the same name. Particular attention was paid to sustainability and high quality of the fitout. The building was handed over to its tenant Wiener Wohnen, an institution that administers Viennese council housing, which uses the location as its headquarters.

Technical Stats

  • 9 ventilation units
  • 3 refrigeration machines
  • 4 heat exchangers
  • 1200 radiators
  • 350 thermo-active building system components
  • 5000m2 acoustic and cooling ceilings

Heating capacity: 1,500 kW

Refrigerating capacity: 2,500 kW

Ventilation: 170,000 m³/h

Smoke extraction: 210,000 m³/h